Button Text

Strategic Planning for Seamless Operation Management

ViTWO ai OM helps plan production by matching the demand with manufacturing capacity, creating schedules based on sales plans, and managing the production cycle. To do this, planned independent requirements are entered, which drive Material Requirement Planning (MRP).

How ViTWO ai Automates Production?

Trigger production automatically upon delivery or manually create orders to accommodate both Make-to-Order and Make-to-Stock scenarios.

Auto-check material requirements up to the nth Semi-Finished Goods (SFG) level and initiate purchase requests for unavailable raw materials or SFG.

Declare comprehensive Bill of Materials (BOM) for Raw Materials (RM), Finished Goods (FG), Trading or Manufacturing, Semi-Finished Goods (SFG), Labor Hour Rates (LHR), and Machine Hour Rates (MHR) up to the nth level.

Efficiently manage and declare consumption postings for each SFG level within a Production order.

MRP checks raw material availability using master data like Bill of Material (BOM) and plant stocks. In case of shortages, it initiates purchase requisitions for external materials and planned orders, kicking off the Procurement Cycle and the Execution Cycle of Operation, respectively.

Features

Operations Management Key Features

his module plays a key role for the production head in streamlining the complete production process, ensuring maximum efficiency and productivity for optimising costs

0

1

Customers can accept quotes directly through a unique link

Quotations automatically transform into Sales Orders for efficient processing

0

2

Streamline material procurement for goods movement, inventory management, physical inventory postings, invoice verification, sales order fulfilment, and production planning and control processes.

0

3

Track and record manufacturing process flows, including planned and actual costs, from raw material conversion to semi-finished goods.

0

4

Align demand with manufacturing capacity to create precise production and procurement schedules.

0

5

Leverage ViTWO ai PP as a crucial module for planning based on budgeted sales, demand management, Material Requirement Planning (MRP), and capacity levelling.

FAQs

Frequently asked questions about Operations Management

How does the production planning system accommodate both Make to Order and Make to Stock scenarios?

The system allows for auto-triggered production from delivery or manual creation of production orders to stock, catering to both Make to Order and Make to Stock needs.

How does the system handle material requirements and purchasing in the production process?

ViTWO ai automatically checks material requirements up to the nth Semi-Finished Goods (SFG) level and triggers purchase requests if any Raw Material (RM) or SFG is unavailable.

What does the Bill of Material (BOM) declaration include?

The BOM declaration encompasses Raw Material (RM), Finished Goods (FG) for both trading and manufacturing, Semi-Finished Goods (SFG), as well as declarations for Labor Hour Rate (LHR) and Machine Hour Rate (MHR).

How is the BOM structured for Semi-Finished Goods (SFG) in production planning?

The system allows users to declare SFG BOM up to the nth level, providing a comprehensive and detailed structure for Semi-Finished Goods in the production process.

How is consumption posting managed for each Semi-Finished Goods (SFG) level in a production order?

Consumption posting is declared for each SFG level in a production order, ensuring accurate tracking and recording of material usage at each stage of the production process.